Wall Refurbishment!
I went into studio today to make sure everything was ready for my installation tomorrow! Thanks goodness I did because the level 2 student that was in the space before me had left it an absolute mess! There was black painted on the walls, there were holes and dirt on another wall:
I started by sanding down all the walls in the space (It took AGES to get the black paint off):
I then had to paint multiple layers of white paint over top until I was happy with how the space looked:
Overall this took me just more than 6 hours straight of working on these walls! I just need to clean the floor tomorrow and I will be ready to install!