top of page

Installation Friday 10/11/2017

Installation went really well, I started by scrubbing the floors clean and preparing everything I needed to install the curtains. I had the scissor lift from 1pm - 4pm. I Bagged the bead strands into massive bags (1 for mine, 2 for Bruce and 3 for Ouma) so that the beads wouldn't hang down and potentially be damaged when I was hanging them up. I focused on getting them the same height as each other and making sure that they were all level. I also attempted to line them up but that didn't work as well as I had hoped. I had to use many levels of contact to hang up the piece to distribute the weight put on the structure I was hanging it from (this has all been discussed and figured out with the head of heath and safety). Over all I am happy with my installation.

The bead strands aren't all 100% the same length because, even though I ordered all the same size 6mm x 6mm, some of them afre slightly smaller or bigger which makes a big difference over all to the strand making it a bit longer or shorter but they are all the correct amount of beads.

It is also very satisfying that the birthday beads (slight gold) line up.

left angle view:

Right angle view:

Straight on:

Direct side:

back view:

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page